The Engineering Division manages most of the Capital Investment Program (CIP) projects for infrastructure that are currently underway in the Town of Collierville. These projects range from major road improvements down to finishing out individual developments. Below is a list of projects recently completed or underway by the Town of Collierville.

If you have a specific concern or question about a project, please feel free to contact the Engineering Department at 901.457.2340 or via email.

Recently Completed:

  • State Route 57 Widening: Design
  • Poplar Avenue and Progress Road: Traffic Signal
  • Installation
  • Byhalia Road and Shelby Drive Traffic Signal: Construction
  • Shelby Drive Annexation
  • Grade Control: WC Johnson Park
  • Alcorn Villages Phases 3 & 4 Drainage Improvements
  • Wilson Street Drainage and Water System
  • Mt. Pleasant Drainage Improvements
  • Collierville-Arlington and Poplar Avenue: Signal Installation
  • Shelby Drive Construction (Byhalia Road to east side of new High School Property Line)
  • Downtown Drainage Phase 1: Construction
  • Friendship/Hurdle Drainage Improvements
  • Downtown Crosswalks: Construction
  • Shelby Drive and Sycamore Road Traffic Signal: Construction

Underway:

  • State Route 57 Widening: Right-of-Way Acquisition by TDOT
  • Shelby Drive Widening (Sycamore Road to Highway 72): Design
  • ADA Transition Plan Phase 2: Design
  • Downtown Drainage Phase 2: Design
  • Poplar Avenue Water Line Improvements: Construction
  • Washington Street Improvements: Design
  • Wolf River Boulevard Resurfacing: Construction
  • SR175 (Shelby Drive): Jasper Park to Shelby Post: Environmental Phase
  • Byhalia Road at Collierville Road Traffic Signal: Environmental Phase
  • Winchester at Shea Road Traffic Signal: Environmental Phase
  • Resurfacing of Various Streets: Group 2
  • Sanders Creek Bank Stabilization: Design
  • Wolf River Lateral IA Bank Stabilization (Red Bark Cove): Construction
  • Frank Road Bridge Bank Stabilization Phase 2: Design
  • Burrows Road Pump Station Elimination: Design
  • Wild Bird Lane Drainage Improvements: Design
  • Totty Lane Drainage Improvements: Design